Slowly continuing on several fronts. The light box construction is finished and is now ready to paint. I’m pleased that this particular aspect has been dealt with as I know there is loads to do that cannot be done at this stage. (eg the photos) This week I started work on the information panel ‘writing the object’. This is proving to be more difficult than expected. Do I write it with some grain of scientific truth about it or go completely into the realms of fantasy? Plus there’s been a steep learning curve with InDesign. But research is turning up some amazing sounding phrases…mixed manifest capabilities/ robust sensor suites/ land based autonomous logistics/node of ultimate synthesis!
Preparation for the sawdust firing of the vessels is ongoing, I have now collected/ sawdust/kindling/wood shavings/ masking tape/ copper wire/clay for masks/materials for marking the surface…and which wax paste is best for polishing? Estimated firing date Tuesday 20 March…hope it doesn’t rain/hope it works/ hope it looks amazing.