A good day today. Have now installed the support system for the projector into the ‘cube’. From their I went on to cut up the lead mouldings (made last weekend) which will hold down the ‘arches’ in the vitrine once the water is added. I think they are heavy enough but I can always add more to the rear supports if they ‘decide to float’. Whilst working with the arches I also did a final sanding to get rid of residual saw burrs. The last task was to make an internal MDF ring to attach the tube to the cube by bolts. Rather than stick the tube to the cube with ‘No-Nails’ I decided to make the tube de-mountable to make the piece more ‘storage friendly’.
Just realised I forgot to take pictures of this stuff…a job for tomorrow.
Tomorrow is the last day before the Easter Break and I think I am on top of what I wanted to achieve by then. Over Easter, I will switch to filming/editing and soundtracks