0 Comments
Viewing single post of blog action-research

Currently negotiating with a school around school looks around proj. very interesting how they can take creative ideas and they slowly become instutionalised into the school bureaucracy. Teachers have got targets to hit; curriculum to teach to and exams to deliver. They, understandably, want to build their objectives into the project, but this can mean that slowly the project changes that initially I’ve thought of as a wide ranging cross-curriculum project, into something that is quite specific to their discipline.

At the moment it is heading towards two different and separate projects. Where the history dept take up one idea and art dept another. I had hoped that it would be one project with each dept working on different aspects of the overarching idea and these would then be pulled together in an after school production team.

I’m not forceful enough to demand that my ideas are taken on board whole heartedly

But I enjoy the process of collaboration and change; and the constraints imposed by other parties. My weakness is that I always want to do too much. Do to many things. I always find this initial stage very engaging. Slowly but surly narrow it down to what we wish to achieve and how we are going to get there.


2 Comments