Well, it’s finally all been happening, and I haven’t had a minute to blog – so now I’ve paid for an afternoon’s childcare and resisted my daughters pleas to stay with me (apparently they would rather ‘do anything, even jobs, than go to summer playschemes’ which they ‘really hate’). So I’m in my studio enjoying a few hours to myself and looking back at recent events. Here’s an update
I set up the installation, feeling really anxious about how it would all come together. It took ages to get the projected image to line up exactly with the table and chairs in the corner of the gallery. The projector is housed inside an old leather suitcase, and needed propping up at a steep angle to get the right effect. I finally got it all sorted and left, hoping that I had left enough air vents for the projector, otherwise it’ll overheat and cut out.
The next day I was working for Creative Partnerships in Hull and got a phone call from the gallery saying that all my equipment had failed. Aaagh… spent a sleepless night worrying about it, how can two new pieces of kit both break simultaneously?, is it a fuse, has the projector overheated, has the bulb blown, if so why doesn’t the DVD player work… Returned first thing the next morning armed with toolbox and production manager (aka my partner).
Turned everything on – it worked fine! Although the projected image was now pointing at the ceiling. I think the gallery had PAT tested my equipment, and moved everything around – I wonder whether the projector had been put back in such a way that it was no longer lined up with the air vents? Anyway, we rigged everything up more securely – a much easier job with two people, and to be honest and my partner is better at technical construction stuff than I am. Anyway, I was just pleased it was all up and running again in time for the preview – which was great – it was well attended and the work was well received. Phew!